Well I just realised it's been almost a month since my last post .... lots has happened ...
Driveway was laid and before I got a chance to see it some stupid dog run across 3 out of the 4 sections leaving a trail of pawprints behind. EBH seem to have some difficulties fixing this and at the moment it looks like S&*^!!!
On Wed 9th we had our PCI, then a few days later we arranged an Independent building Inspection, even though I was told by our SS that we were wasting our money ... the report we received back seemed to prove otherwise ... 10 pages of defects.
Most of the defects are minor, but there are few more significant things, like obviously the above mentioned driveway, a section of the bricks overhanging the slab, a downlight positioned way too close to a gas line in the roof, our reticulated termite system being exposed.
After our PCI we were told handover should be booked within 2 - 3 weeks depending on the findings of the Tyrells inspection EBH arranges .... we are 1.5 weeks after PCI and still no word yet on handover, so watch this space!